Private sewer lateral inspection and tests checklist

Inspection of a building's private lateral from the public sewer to the building drain: new connections, repairs and abandonments, with the exfiltration or air, hydrostatic and dye tests.

Based on: Common sewer agency lateral standards

Print this page for a blank field form; the website around it is left off.

Connection

ItemPassFailN/A
Inspection requested with at least 1 working day's notice (typical); permit and lateral construction information on site
Direct connection to an existing main or manhole: coring and saddle or manhole connection inspected Photo

Pipe

ItemPassFailN/A
Pipe, fittings, couplings, bedding and cleanout parts match the specifications
Slope and alignment acceptable; couplings aligned; minimum cover met
Bedded to spring line and inspected before backfill Photo
Connections to the stub or main and to the building drain built to the details
Marking tape on site for backfill; separation from other utilities met

Cleanouts

ItemPassFailN/A
Cleanouts placed where required, standpipes vertical, caps and covers per specification Photo
Cleanout locations measured and recorded (house sheet or coordinates) for the sewer operator's records

Tests

ItemPassFailN/A
Gravity lateral exfiltration test underway before arrival: standpipe 3 ft above grade, held at least 15 minutes, leakage under 0.16 gal per inch of diameter per 100 ft per hour (typical); or a low-pressure air test
Low-pressure lateral or ejector line hydrostatic test: 5 psi above the pump's maximum rating (65 psi maximum), held 15 minutes (typical)
Pressure-to-gravity transition: pressure and gravity parts tested separately, final connection a single new joint
Dye test: dyed test water seen passing the next downstream manhole Photo
TV inspection of the connection, where the agency requires it

Pumps

ItemPassFailN/A
Exterior pump operation observed; low-pressure pump start-up done by the supplier

Other

ItemPassFailN/A
No sump pump, foundation drain, roof drain or other groundwater or stormwater connected to the lateral
Abandoned lateral capped at the main or stub per the detail and inspected before backfill Photo
Repair of a damaged lateral inspected before backfill

Follow-up

ItemPassFailN/A
Deficiencies given to the contractor on site and listed in a partial inspection letter; re-inspection scheduled

Photo A photo is expected with this item.

This checklist is a starting point. Check each item against your current permit and your agency's standards before relying on it. For sewer districts and public works departments in any state: construction and acceptance of public sewer mains, private laterals and interceptors, and grease (FOG) compliance at food service businesses. Test methods follow common standards (UNI-B-6, ASTM F1417, ASTM C1244). Values marked "typical" are common values from published sewer agency standards and pretreatment rules; replace them with your own agency's standards and ordinances.

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.