inspectorjay Try the live demo

Utah inspection checklists

Based on the Utah Division of Water Quality UPDES Construction General Permit (UTRC00000) as renewed in 2019 and modified in 2020. Section numbers refer to that permit; check them against the current permit before relying on a template.

  • Utah CGP construction site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 oversight visits.

    24 items · Based on Utah UPDES Construction General Permit UTRC00000, Parts 1-3 (CGP section noted on each item)

  • Utah SWPPP document review

    Office or on-site review of the SWPPP itself, before or at the first inspection.

    14 items · Based on Utah UPDES Construction General Permit UTRC00000, Part 7 (SWPPP contents)

  • Utah post-storm inspection (0.5 in. or more)

    Follow-up after a storm of 0.5 inch or more, focused on where water went and what controls failed.

    11 items · Based on Utah UPDES Construction General Permit UTRC00000, Part 4 (inspections) and Part 5 (corrective action)

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.