inspectorjay Try the live demo

Rhode Island inspection checklists

Based on the RIDEM RIPDES Construction General Permit and the Rhode Island Soil Erosion and Sediment Control Handbook. The plan is the Soil Erosion and Sediment Control (SESC) Plan. Check each template against the current permit and your local requirements before relying on it.

  • Rhode Island RIPDES CGP site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

    25 items · Based on RIDEM RIPDES Construction General Permit

  • Rhode Island post-storm inspection

    Follow-up after a storm that causes runoff, or the storm size the permit names, focused on where water went and what controls failed.

    11 items · Based on RIDEM RIPDES Construction General Permit: inspection and corrective action requirements

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.