inspectorjay Try the live demo

North Carolina NCG01 self-inspection checklist

The weekly and post-rain self-inspection: at least once every 7 calendar days and within 24 hours of 1.0 inch of rain in 24 hours.

Based on: NC DEQ Construction Stormwater General Permit NCG010000, Part III (self-inspection) and Part II (stabilization)

Print this page for a blank field form; the website around it is left off.

Rain gauge

ItemPassFailN/A
Rain gauge on site and maintained; daily rainfall recorded

E&SC measures

ItemPassFailN/A
Erosion and sedimentation control measures installed and working as in the approved plan Photo
Measures needing maintenance or repair listed with the corrective action

Discharge outfalls

ItemPassFailN/A
Each stormwater discharge outfall checked for visible sediment or turbidity Photo

Site perimeter

ItemPassFailN/A
No sediment leaving the site at the perimeter; any off-site deposits noted

Streams and wetlands

ItemPassFailN/A
Streams and wetlands on or next to the site checked for sediment deposits Photo

Stabilization

ItemPassFailN/A
Perimeter dikes, swales, ditches, slopes steeper than 3:1 and HQW zones stabilized within 7 days
Other disturbed areas where work has stopped stabilized within 14 days

Records

ItemPassFailN/A
Self-inspection records and the approved plan kept on site and available

Photo A photo is expected with this item.

This checklist is a starting point. Check each item against your current permit and your agency's standards before relying on it. Based on the NC DEQ NPDES Construction Stormwater General Permit NCG010000 (2019). Check against the current permit before relying on a template.

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.