inspectorjay Try the live demo

North Carolina inspection checklists

Based on the NC DEQ NPDES Construction Stormwater General Permit NCG010000 (2019). Check against the current permit before relying on a template.

  • North Carolina NCG01 self-inspection

    The weekly and post-rain self-inspection: at least once every 7 calendar days and within 24 hours of 1.0 inch of rain in 24 hours.

    9 items · Based on NC DEQ Construction Stormwater General Permit NCG010000, Part III (self-inspection) and Part II (stabilization)

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.