Connecticut inspection checklists
Based on the CT DEEP General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities, and the Connecticut Guidelines for Soil Erosion and Sediment Control. Connecticut calls the SWPPP a Stormwater Pollution Control Plan (SWPCP). Check each template against the current permit and your local requirements before relying on it.
-
Connecticut construction stormwater site inspection
Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.
-
Connecticut post-storm inspection
Follow-up after a storm that causes runoff, or the storm size the permit names, focused on where water went and what controls failed.
Know when these checklists change
Permits get renewed and their requirements move. Leave your email and we'll tell you when we update the Connecticut checklists or add new ones. A few emails a year at most.
You're on the list. We'll email you when the Connecticut checklists change.
That didn't go through. Check your email address and try again, or write to hello@inspectorjay.com.
Fill it in on your phone instead.
In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.