California CGP site inspection checklist

Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

Based on: California Construction Stormwater General Permit, Order 2022-0057-DWQ (NPDES CAS000002)

Print this page for a blank field form; the website around it is left off.

Entrance

ItemPassFailN/A
Permit coverage posted at the entrance where the public can read it, with the permit or authorization number, a contact, and where to see the SWPPP
SWPPP on site, or available as the permit allows, and current
Streets and sidewalks next to the site free of tracked mud and sediment Photo
Stabilized construction exits (stone pads, rumble plates, wheel wash) at every exit and maintained Photo

Perimeter

ItemPassFailN/A
Perimeter controls (silt fence, wattles, berms) installed per the SWPPP, intact, and not overtopped Photo
Sediment behind perimeter controls removed before it builds up to half their height
Buffers to streams, wetlands and other waters kept, or equivalent controls in place
Velocity dissipation at outlets and along channels; no scour or erosion
No sediment or other pollutants visibly leaving the site at any discharge point Photo

Interior

ItemPassFailN/A
Storm drain inlets on and next to the site protected, and sediment around them removed Photo
Soil and material stockpiles covered or contained, and away from inlets and conveyances
Dust controlled on exposed soil and haul roads
Disturbed areas where work has stopped stabilized within the permit's deadline; slopes protected
Sediment basins and traps working, with storage capacity left
Dewatering water treated before discharge; no turbid water pumped off the site
Active and inactive areas protected with the BMPs the risk level requires Photo

Pollution prevention

ItemPassFailN/A
Fueling, maintenance and equipment washing areas have spill prevention and containment
Chemicals and hazardous materials stored with secondary containment and cover
No spills or leaks; any spill contained and cleaned up Photo
Trash and construction debris contained, covered and emptied before overflowing
Portable toilets secured, away from inlets and drainage, and not leaking
Concrete, stucco and paint washout contained, not leaking, and below capacity Photo

Records

ItemPassFailN/A
Visual inspections at least weekly, and before, during and after qualifying precipitation events, as the permit and risk level require
Inspections done by the Qualified SWPPP Practitioner (QSP) or a trained delegate; the SWPPP prepared by a Qualified SWPPP Developer (QSD)
Corrective actions from earlier inspections logged and fixed or scheduled on time
SWPPP site map shows the BMPs as they are installed today
Site's risk level and the sampling it requires known; turbidity and pH sampled at discharge points when required, and compared to the numeric action levels
Inspections, sampling results and reports entered in SMARTS when the permit requires

Photo A photo is expected with this item.

This checklist is a starting point. Check each item against your current permit and your agency's standards before relying on it. Based on the State Water Resources Control Board Construction Stormwater General Permit, Order 2022-0057-DWQ (NPDES CAS000002). Requirements vary by the site's risk level; sampling and reports go into SMARTS. Check each template against the current permit and your local requirements before relying on it.

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.