inspectorjay Try the live demo

Wisconsin inspection checklists

Based on the Wisconsin DNR WPDES Construction Site Storm Water Runoff General Permit (WI-S067831), NR 216 and NR 151, and the DNR's technical standards. Check each template against the current permit and your local requirements before relying on it.

  • Wisconsin WI-S067831 site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

    25 items · Based on Wisconsin DNR WPDES General Permit WI-S067831 (NR 216, NR 151)

  • Wisconsin post-storm inspection (0.5 in. or more)

    Follow-up after a storm of 0.5 in. or more, focused on where water went and what controls failed.

    11 items · Based on Wisconsin DNR WPDES General Permit WI-S067831 (NR 216, NR 151): inspection and corrective action requirements

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.