Wisconsin inspection checklists
Based on the Wisconsin DNR WPDES Construction Site Storm Water Runoff General Permit (WI-S067831), NR 216 and NR 151, and the DNR's technical standards. Check each template against the current permit and your local requirements before relying on it.
-
Wisconsin WI-S067831 site inspection
Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.
-
Wisconsin post-storm inspection (0.5 in. or more)
Follow-up after a storm of 0.5 in. or more, focused on where water went and what controls failed.
Know when these checklists change
Permits get renewed and their requirements move. Leave your email and we'll tell you when we update the Wisconsin checklists or add new ones. A few emails a year at most.
You're on the list. We'll email you when the Wisconsin checklists change.
That didn't go through. Check your email address and try again, or write to hello@inspectorjay.com.
Fill it in on your phone instead.
In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.