Washington inspection checklists
Based on the Ecology Construction Stormwater General Permit and the Stormwater Management Manuals for Western and Eastern Washington. Sites of 1 acre or more sample turbidity and, with significant concrete work, pH. Check each template against the current permit and your local requirements before relying on it.
-
Washington CSWGP discharge sampling
Weekly turbidity or transparency sampling, and pH sampling where required, with the benchmark checks and follow-up the permit sets.
-
Washington CSWGP site inspection
Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.
-
Washington post-storm inspection
Follow-up after any stormwater discharge from the site, focused on where water went and what controls failed.
Know when these checklists change
Permits get renewed and their requirements move. Leave your email and we'll tell you when we update the Washington checklists or add new ones. A few emails a year at most.
You're on the list. We'll email you when the Washington checklists change.
That didn't go through. Check your email address and try again, or write to hello@inspectorjay.com.
Fill it in on your phone instead.
In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.