inspectorjay Try the live demo

Texas inspection checklists

Based on the TCEQ TPDES Construction General Permit TXR150000. Sites over the Edwards Aquifer also follow 30 TAC chapter 213. Check each template against the current permit and your local requirements before relying on it.

  • Texas TXR150000 site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

    26 items · Based on TCEQ TPDES Construction General Permit TXR150000

  • Texas post-storm inspection (0.5 in. or more)

    Follow-up after a storm of 0.5 in. or more, focused on where water went and what controls failed.

    11 items · Based on TCEQ TPDES Construction General Permit TXR150000: inspection and corrective action requirements

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.