inspectorjay Try the live demo

New York inspection checklists

Based on the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-25-001) and the New York State Standards and Specifications for Erosion and Sediment Control (the Blue Book). Check each template against the current permit and your local requirements before relying on it.

  • New York SPDES GP site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

    27 items · Based on NYSDEC SPDES General Permit GP-0-25-001

  • New York post-storm inspection

    Follow-up after a storm that causes runoff, or the storm size the permit names, focused on where water went and what controls failed.

    11 items · Based on NYSDEC SPDES General Permit GP-0-25-001: inspection and corrective action requirements

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.