New Mexico inspection checklists
New Mexico is covered by EPA's 2022 Construction General Permit. Check each template against the current permit and your local requirements before relying on it.
-
New Mexico EPA CGP site inspection
Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.
-
New Mexico post-storm inspection (0.25 in. or more)
Follow-up after a storm of 0.25 in. or more, focused on where water went and what controls failed.
Know when these checklists change
Permits get renewed and their requirements move. Leave your email and we'll tell you when we update the New Mexico checklists or add new ones. A few emails a year at most.
You're on the list. We'll email you when the New Mexico checklists change.
That didn't go through. Check your email address and try again, or write to hello@inspectorjay.com.
Fill it in on your phone instead.
In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.