Nebraska inspection checklists
Based on the Nebraska Department of Environment and Energy (NDEE) Construction Stormwater General Permit NER210000 (2021 to 2026). Check each template against the current permit and your local requirements before relying on it.
-
Nebraska NER21 site inspection
Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.
-
Nebraska post-storm inspection
Follow-up after a storm that causes runoff, or the storm size the permit names, focused on where water went and what controls failed.
Know when these checklists change
Permits get renewed and their requirements move. Leave your email and we'll tell you when we update the Nebraska checklists or add new ones. A few emails a year at most.
You're on the list. We'll email you when the Nebraska checklists change.
That didn't go through. Check your email address and try again, or write to hello@inspectorjay.com.
Fill it in on your phone instead.
In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.