inspectorjay Try the live demo

Minnesota inspection checklists

Based on the MPCA Construction Stormwater General Permit MNR100001 (2023 to 2028). Check each template against the current permit and your local requirements before relying on it.

  • Minnesota MNR10 site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

    27 items · Based on MPCA Construction Stormwater General Permit MNR100001 (2023)

  • Minnesota post-storm inspection (over 0.5 in. in 24 hours)

    Follow-up after a storm of over 0.5 in. in 24 hours, focused on where water went and what controls failed.

    11 items · Based on MPCA Construction Stormwater General Permit MNR100001 (2023): inspection and corrective action requirements

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.