Minnesota inspection checklists
Based on the MPCA Construction Stormwater General Permit MNR100001 (2023 to 2028). Check each template against the current permit and your local requirements before relying on it.
-
Minnesota MNR10 site inspection
Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.
-
Minnesota post-storm inspection (over 0.5 in. in 24 hours)
Follow-up after a storm of over 0.5 in. in 24 hours, focused on where water went and what controls failed.
Know when these checklists change
Permits get renewed and their requirements move. Leave your email and we'll tell you when we update the Minnesota checklists or add new ones. A few emails a year at most.
You're on the list. We'll email you when the Minnesota checklists change.
That didn't go through. Check your email address and try again, or write to hello@inspectorjay.com.
Fill it in on your phone instead.
In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.