inspectorjay Try the live demo

Michigan inspection checklists

Based on Michigan EGLE's Part 91 Soil Erosion and Sedimentation Control program (NREPA) and the Part 31 Permit-by-Rule (R 323.2190) Notice of Coverage. Check each template against the current permit and your local requirements before relying on it.

  • Michigan Part 91 site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

    26 items · Based on Michigan EGLE Part 91 (Soil Erosion and Sedimentation Control) and Part 31 Permit-by-Rule (R 323.2190)

  • Michigan post-storm inspection

    Follow-up after precipitation that results in a discharge, focused on where water went and what controls failed.

    11 items · Based on Michigan EGLE Part 91 (Soil Erosion and Sedimentation Control) and Part 31 Permit-by-Rule (R 323.2190): inspection and corrective action requirements

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.