Massachusetts EPA CGP site inspection checklist

Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

Based on: EPA 2022 NPDES Construction General Permit (Massachusetts)

Print this page for a blank field form; the website around it is left off.

Entrance

ItemPassFailN/A
Permit sign at the entrance with the NPDES ID, operator contact, where to see the SWPPP, and the EPA notice for reporting pollution
SWPPP on site, or available as the permit allows, and current
Streets and sidewalks next to the site free of tracked mud and sediment Photo
Stabilized construction exits (stone pads, rumble plates, wheel wash) at every exit and maintained Photo

Perimeter

ItemPassFailN/A
Perimeter controls (silt fence, wattles, berms) installed per the SWPPP, intact, and not overtopped Photo
Sediment behind perimeter controls removed before it builds up to half their height
Buffers to streams, wetlands and other waters kept, or equivalent controls in place
Velocity dissipation at outlets and along channels; no scour or erosion
No sediment or other pollutants visibly leaving the site at any discharge point Photo

Interior

ItemPassFailN/A
Storm drain inlets on and next to the site protected, and sediment around them removed Photo
Soil and material stockpiles covered or contained, and away from inlets and conveyances
Dust controlled on exposed soil and haul roads
Stabilization started as soon as work stops in an area, and completed within 14 calendar days (7 days for sites discharging to sensitive waters)
Sediment basins and traps working, with storage capacity left
Dewatering water treated before discharge; no turbid water pumped off the site
Dewatering discharges treated before leaving the site; turbidity monitored where the 2022 CGP requires it Photo

Pollution prevention

ItemPassFailN/A
Fueling, maintenance and equipment washing areas have spill prevention and containment
Chemicals and hazardous materials stored with secondary containment and cover
No spills or leaks; any spill contained and cleaned up Photo
Trash and construction debris contained, covered and emptied before overflowing
Portable toilets secured, away from inlets and drainage, and not leaking
Concrete, stucco and paint washout contained, not leaking, and below capacity Photo

Records

ItemPassFailN/A
Inspections at least once every 7 calendar days, or every 14 days and within 24 hours of a 0.25 in. storm (every 7 days and after 0.25 in. for sensitive waters)
Inspections done by a qualified person who has completed the training the CGP requires
Corrective actions from earlier inspections logged and fixed or scheduled on time
SWPPP site map shows the BMPs as they are installed today
Corrective actions documented within 24 hours and completed within the CGP's deadlines

Photo A photo is expected with this item.

This checklist is a starting point. Check each item against your current permit and your agency's standards before relying on it. Massachusetts is covered by EPA's 2022 Construction General Permit. Local conservation commissions also issue Orders of Conditions under the Wetlands Protection Act. Check each template against the current permit and your local requirements before relying on it.