inspectorjay Try the live demo

Kansas inspection checklists

Based on the KDHE General Permit for Stormwater Runoff from Construction Activities S-MCST-2208-1 (2022 to 2027). Soil disturbance starts only after KDHE's authorization. Check each template against the current permit and your local requirements before relying on it.

  • Kansas S-MCST site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

    25 items · Based on KDHE General Permit for Stormwater Runoff from Construction Activities S-MCST-2208-1

  • Kansas post-storm inspection

    Follow-up after a storm that causes runoff, or the storm size the permit names, focused on where water went and what controls failed.

    11 items · Based on KDHE General Permit for Stormwater Runoff from Construction Activities S-MCST-2208-1: inspection and corrective action requirements

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.