inspectorjay Try the live demo

Florida inspection checklists

Based on the FDEP NPDES Generic Permit for Stormwater Discharge from Large and Small Construction Activities (Rule 62-621.300(4)(a), F.A.C.). Check each template against the current permit and your local requirements before relying on it.

  • Florida CGP site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

    26 items · Based on FDEP NPDES Generic Permit for Stormwater Discharge from Large and Small Construction Activities (Rule 62-621.300(4)(a), F.A.C.)

  • Florida post-storm inspection (0.50 in. or more)

    Follow-up after a storm of 0.50 in. or more, focused on where water went and what controls failed.

    12 items · Based on FDEP NPDES Generic Permit for Stormwater Discharge from Large and Small Construction Activities (Rule 62-621.300(4)(a), F.A.C.): inspection and corrective action requirements

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.