inspectorjay Try the live demo

Colorado inspection checklists

Based on the CDPHE Water Quality Control Division General Permit COR400000 (renewed 2024) for stormwater discharges associated with construction activities. Colorado calls the SWPPP a Stormwater Management Plan (SWMP). Check each template against the current permit and your local requirements before relying on it.

  • Colorado COR400000 site inspection

    Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.

    26 items · Based on CDPHE General Permit COR400000

  • Colorado post-storm inspection

    Follow-up after precipitation or snowmelt that causes surface erosion, focused on where water went and what controls failed.

    12 items · Based on CDPHE General Permit COR400000: inspection and corrective action requirements

All states and topics

Fill it in on your phone instead.

In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.