Colorado inspection checklists
Based on the CDPHE Water Quality Control Division General Permit COR400000 (renewed 2024) for stormwater discharges associated with construction activities. Colorado calls the SWPPP a Stormwater Management Plan (SWMP). Check each template against the current permit and your local requirements before relying on it.
-
Colorado COR400000 site inspection
Routine stormwater inspection of an active construction site, from the entrance to the perimeter to the interior. For the operator's scheduled inspections and for MS4 or county oversight visits.
-
Colorado post-storm inspection
Follow-up after precipitation or snowmelt that causes surface erosion, focused on where water went and what controls failed.
Know when these checklists change
Permits get renewed and their requirements move. Leave your email and we'll tell you when we update the Colorado checklists or add new ones. A few emails a year at most.
You're on the list. We'll email you when the Colorado checklists change.
That didn't go through. Check your email address and try again, or write to hello@inspectorjay.com.
Fill it in on your phone instead.
In inspectorjay, every item gets a pass or fail, a dictated note, and geotagged photos, and the report goes to the contractor before you leave the site.