Arkansas post-storm inspection checklist

Follow-up after a storm that causes runoff, or the storm size the permit names, focused on where water went and what controls failed.

Based on: Arkansas DEQ Construction Stormwater General Permit ARR150000: inspection and corrective action requirements

Print this page for a blank field form; the website around it is left off.

Storm

ItemPassFailN/A
Rainfall amount and date recorded (site rain gauge or the weather station named in the SWPPP)
Inspection made within the time the permit allows after the storm, or the reason it wasn't

Discharges

ItemPassFailN/A
Each discharge point observed; any sediment, turbidity or sheen described Photo
Receiving water or storm drain downstream checked for sediment deposits

Controls

ItemPassFailN/A
Perimeter controls intact after the storm: no breaches, undercutting or overtopping Photo
Inlet protection intact and not clogged; sediment removed Photo
Sediment basins and traps have capacity for the next storm
Track-out cleaned from streets after the storm
Slopes and stabilized areas free of new rills and gullies
Washouts and stockpiles not washed out or overflowing

Follow-up

ItemPassFailN/A
Every failure found entered as a corrective action with a fix date

Photo A photo is expected with this item.

This checklist is a starting point. Check each item against your current permit and your agency's standards before relying on it. Based on the Arkansas Division of Environmental Quality (Department of Energy and Environment) Construction Stormwater General Permit ARR150000. Check each template against the current permit and your local requirements before relying on it.